BÚZIOS 7/FPSO Almirante Tamandaré begins production in the pre-salt

Posted on 2025.02.15

Text copied!

Petrobras informs that the FPSO Almirante Tamandaré (Búzios 7) has started production today, 02/15, in the Búzios field, located in the pre-salt layer of the Santos Basin. This is the first high-capacity unit to be installed in the field, with the potential to produce up to 225,000 barrels of oil per day (bpd) and process 12 million cubic meters of gas daily. In total, 15 wells will be connected to the platform through a subsea infrastructure, including 7 oil producers, 6 water and gas injectors, 1 convertible well (producer and injector), and 1 gas injector.

The FPSO Almirante Tamandaré is part of the sixth production system of Búzios and will contribute to the field reaching a production level of 1 million barrels of oil per day, expected by the second half of 2025. Shortly, it is anticipated that Búzios will become Petrobras' largest production field, with the goal of reaching 2 million barrels per day by 2030.

The unit was leased from SBM Offshore and, in addition to having above-average capacity compared to industry standards, it is equipped with decarbonization technologies, such as a closed flare system, which helps reduce greenhouse gas emissions into the atmosphere. The unit also features heat recovery technologies that reduce the demand for additional energy.

The Búzios consortium is composed of Petrobras (operator), the Chinese partner companies CNOOC and CNODC, as well as PPSA, the company responsible for managing production-sharing contracts.

Notes

Downloads

Text of this article

Text download

Photos from this article

Download photos

Videos from this article





Canais

Idioma

Acessibilidade

Choose a channel:

Do a search:

Search suggestions

Link do botão
Ícone do botão Exibir mais resultados
Ícone de carregamento

Most searched

Fuel price

Pre-salt

Team Petrobras

Accessibility:

High-Contrast

Off

On

Big Text

Off

On

Language:

Select a language: